8 Power Grid Scheduling
Issue 12 (2019-01-15)
Copyright © Huawei Technologies Co., Ltd.
263
Figure 8-10
Dry contact remote control
A maximum of 16 levels are supported for power factors.
"√" indicates low level. When connecting to GND2, the four DI ports of the SmartLogger are
low-level ports. If not connected, the ports are high-level ports.
The status combination of DI1(GND2)–DI4(GND2) should differ from each other. Otherwise,
abnormal command parsing will occur.
If the actual input DI signal is inconsistent with that configured on the WebUI, the SmartLogger
does not allow the SUN2000 to generate reactive power and the
Abnormal Reactive Schedule
alarm is generated.
If
Active Power Control
is set to
AI remote control
,
Dry contact remote control
is unavailable
for
Reactive Power Control
.
8.3.3 Reactive Power Fix Control
If the PV plant is required to generate at the grid-tied point specified constant reactive power
within the power factor range, set
Reactive power control mode
to
Reactive power fix
control
.