6 Installing the Service Subrack
7
Determine the location of floating nuts
by using the installation template.
Install the upper and lower cable manager.
Install the service subrack.
Installation
template
Phillips screwdriver
Upper cable manager
Lower cable manager
Locate the installation positions of
the cable manager and service
subrack on the mounting bars, and
install captive nuts at these
positions.
Floating nut
Mounting bar (use a
flat-head screwdriver
if no mounting bar is
available.)
Содержание SmartAX MA5800-X15
Страница 1: ...HUAWEI TECHNOLOGIES CO LTD SmartAX MA5800 X15 Quick Installation Guide Issue 02 Date 2017 03 31 ...
Страница 15: ...7 Routing Cables Network cable 7 5 Routing Network Cables TO the maintenance terminal or transmission unit 12 ...
Страница 16: ...7 Routing Cables 7 6 Routing Trunk Cables Trunk cable Flat head screwdriver Binding position 13 To DDF ...