Table A-3
Mapping between the cross-sectional area and the length of the insulation layer to
be peeled off (L1)
Cross-Sectional Area (mm
2
)
L1 (mm)
1
7
1.5
7
2.5
7
4
8
6
9
10
11
16
13
25
14
35
16
50
16
NOTE
If you peel off the insulation layer off the power cable properly on site, you can compare the cable with
the connector to be crimped.
Step 3
Insert the bare conductor of the power cable into the OT terminal B, and then press the OT
terminal close to the insulation layer C, as shown in
Figure A-7
Installing heat shrink tubing and bare crimping terminal
C
B
A
L2
SmartAX MA5612 Multi-service Access Module
Maintenance Guide
A Appendix
Issue 01 (2012-07-25)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
273