RRU5303
Installation Guide
6 Hoisting an RRU and Related Cables onto a Tower
Issue Draft B (2018-05-15)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
43
4.
Installation engineer C pulls the lifting sling downwards, and installation engineer D
pulls the traction sling outwards to protect the optical fibers from colliding with the
tower.
Step 2
Secure the optical fibers to the tower vertically using cable clips.
Step 3
Remove the lifting sling, traction sling, and protection pipe.
The procedure for hoisting the optical fibers onto the tower is for your reference only.
----End
6.3 Hoisting Power Cables onto a Tower
This section describes the procedure for hoisting power cables onto a tower and the
precautions that must be taken.
Context
Cabling requirements for power cables are met. For details, see 8.1 Cabling Requirements.
The procedure for adding a connector to the RRU power cable on the RRU side is done under
the tower.
Procedure
Step 1
Hoist the power cables onto the tower, as shown in Figure 6-9.