
Figure 3-5
Removing fasteners from the packing case
Step 5
Take out the rack and place it in an appropriate position in the conference room.
For details about where you can place the rack, see the
Standard Document to the Decoration
of Huawei RP Series Telepresence Conference Room
.
DANGER
The rack is heavy. At least two persons are required to hold and move it. When lifting or moving
the rack, pay special attention to your safety. Use one hand to hold the rack base and the other
hand to hold one side of the rack, as shown in Figure 3-7. Ask your partner to hold the rack in
the same way on the other side. Lift the rack and move it to the left or right to prevent it from
being blocked by the fasteners.
HUAWEI RP100&RP200 Room Presence
Commissioning Guide
3 Installation
Issue 01 (2015-02-12)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
18