Quidway NetEngine80
Configuration Guide - Basic Configurations
12 Patch Management
Issue 04 (2009-12-20)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
12-9
Step 3
Run:
patch
run
slave
The slave MPU patch is run.
----End
A patch can be run only after it is activated. Running a patch means that the patch is activated
permanently and the patch remains valid after the board is reset.
12.5 Stop Running the MPU Patch
12.5.1 Establishing the Configuration Task
Applicable Environment
After a patch is activated, you need to judge that the patch has achieved the expected effect. If
the patch does not become valid, you need to activate the patch.
A patch can be deactivated only after it is activated.
Pre-configuration Tasks
None.
Data Preparation
None.
Configuration Procedures
No.
Procedure
1
Deactivating the MPU Patch
12.5.2 Deactivating the MPU Patch
Do as follows on the router to be upgraded.
Step 1
Run:
system-view
The system view is displayed.
Step 2
Run:
patch
deactive
The MPU patch is deactivated.
Step 3
Run: