
PowerCube 5000 (SUN2000-150KTL-S0)
Installation Guide
6 Installing a BIM
Issue 03 (2020-04-10)
Copyright © Huawei Technologies Co., Ltd.
43
6
Installing a BIM
Switch off the battery circuit breaker before installing a BIM.
Before attaching the BIM fastener, ensure that the installation surface is smooth and
dustless.
If the BIM will not be used for a long period, disconnect the BIM cables or remove the
BIM to avoid power consumption which can affect the battery life.
Scenario 1 (Installing on the Battery Top)
Step 1
(Optional) Remove the insulation cover from a battery.
Step 2
Connect the negative and positive cables of the BIM to the negative and positive terminals of
the battery respectively.
The battery appearance is for reference only.