2 Installing/Routing Ground and Power Cables
Installing Power Cables
e
Do not install or remove power cables while the equipment is powered on. Ensure that the circuit breaker or fuse
of the first power cabinet is disconnected prior to removing or installing a power cable to avoid bodily injuries.
CAUTION
• The equipment is powered off only after all power inputs to each PIU
board are disconnected.
WARNING
• The label below advises you to read corresponding manuals before
operating the equipment.
• Install the OT terminals on the power cables according to the instructions
on the plastic cover of each PIU board. Ensure that the terminals are
installed correctly.
M6 combination
screws:
50
±
10% kgf·cm
M6 combination
screws:
50
±
10% kgf·cm
M3 captive
screw:
3
±
10% kgf·cm
Connect the power cables to the screws on the left
legs of the copper fittings, and the input current shall
be 125A.
CAUTION
Copper fitting
(short)
Copper fitting
(long)
Note
• The colors of power cables are
determined based on customer
requirements.
Phillips screwdriver
Power cables
When the number of power inputs for the array cabinets in the equipment
room of the customer cannot meet the requirements of the 5 + 5 power
supply solution, short-circuiting processing is required for power input of
the PIUs using copper fittings. There are two locations for installing copper
fittings on a PIU. Install short copper fittings and corresponding input
power cables, and then install long copper fittings and corresponding input
power cables.