Assembling OT Terminals 

 

Material: OT terminals (ring terminals) , heat-shrinkable tube and cable. 

Strip a part of the jacket off the cable to expose the 
conductor with a length of L1. 

L1 = 23 mm to 25 mm 

L1 

Conductor 

When stripping the jacket off the cable, do not 
damage the metal conductor of the cable. 

Press the end of the contact terminal on the 
conductor by using the crimping tool. 

Heat the heat-shrinkable tube by using a heat gun. 

Lead the cable through the heat-shrinkable tube, 
and then place the contact terminal on the 
exposed conductor. 

    A: heat-shrinkable 

B: OT terminals  

•Close contact between the contact terminal and the end of 
the jacket of the cable is required. 

•When placing the contact terminal on the conductor 
closely to the end of the jacket, ensure that the L2 part of 
the conductor which sticks out of the contact terminal 
cannot exceed 2 mm. 

    C: power cable                  
insulation layer 

Heat gun 

Do not overheat the heat shrink tube. Otherwise, 
the insulation layer may be damaged.

 

CAUTION 

CAUTION 

CAUTION 

Appendixes

 

Содержание NE08E-S6

Страница 1: ...HUAWEI TECHNOLOGIES CO LTD ATOM GPS Indoor NE08s and AE 905S Quick Installation Guide Issue 01 Date 2016 12 20 ...

Страница 2: ... and features described in this document may not be within the purchase scope or the usage scope Unless otherwise specified in the contract all statements information and recommendations in this document are provided AS IS without warranties guarantees or representations of any kind either express or implied The information in this document is subject to change without notice Every effort has been...

Страница 3: ...e GPS Satellite Antenna System Pages 4 5 End Start Preparation For Installation Tools for Installation Page 1 Appendixes Pages 7 8 Assembling OT Terminals Page 7 Perform power on check Page 6 Requirements for GPS Antenna Installation Positions Page 8 Overall Installation Effect Page 3 0 ...

Страница 4: ...antenna position see Appendixes 2 Measuring tape Phillips screwdriver Flat head screwdriver Adjustable Wrench Level Ratchet crimp tool Cable Cutter Wire stripper Diagonal pliers Paper knife Multimeter ESD gloves Insulation tape Tools for Installation Ladder or ladder truck NOTE EHS requirements The installation personnel should wear safety belts helmets shoes and gloves for climb operations Exerci...

Страница 5: ... a device separately installing them on the optical interfaces of two boards is recommended If you need to install two AE 905Ss on the same board inserting the modules at an interval of at least four optical interfaces is recommended Loosen the ejector lever a Indoor NE08E Example NE08E S6 AE 905S b 10 Optical interface Alarm interface Power supply interface Clock interface Time interface Antistat...

Страница 6: ...ong the cable rack that is mounted on the wall and use feeder fasteners to fix the feeder The interval between feeder fasteners is 2 5 m Route the feeder along the cable rack that is mounted on the wall and use feeder fasteners to fix the feeder The interval between feeder fasteners is 2 5 m NE08E GPS antenna lightning protection component Feeder ...

Страница 7: ...mplifier if the feeder length exceeds 80 m Dual female conversion adapter Lightning protection component Protect Surge Installing the GPS Satellite Antenna System Deployment of a Lightning Protection Component Together with an Amplifier Surge Connect the RF IN interface of the amplifier to the Protect interface of the lightning protection component and use a wrench to secure the joint Lightning pr...

Страница 8: ...rt the AE 905S into an optical interface of the NE08E device with the wrench on the AE 905S being locked Connect the other end of the coaxial cable to the AE 905S The coaxial cable must be routed without affecting the cabling of neighboring boards Do not connect the coaxial cable to any AE 905S inserted into an optical interface adjacent to another optical interface with an optical attenuation mod...

Страница 9: ...odule works properly Steady on Red The AE 905S module encounters a hardware fault or overtemperature event Flashing at an interval of 1s Red The frequency or time of the GPS is out of lock Flashing at an interval of 1s Green The GE port is unavailable not linked Off 1 The module is not running 2 The module is not powered on ...

Страница 10: ...e tube by using a heat gun Lead the cable through the heat shrinkable tube and then place the contact terminal on the exposed conductor A heat shrinkable B OT terminals Close contact between the contact terminal and the end of the jacket of the cable is required When placing the contact terminal on the conductor closely to the end of the jacket ensure that the L2 part of the conductor which sticks...

Страница 11: ...uilding 90 Building Figure 1 General Requirements This describes the requirements for the installation positions of the GPS antennas under different installation environments Requirements for Installation on the Roof 1 The GPS antenna should be installed in the middle of a roof Avoid installing it on the surrounding walls 2 The GPS shall not be installed on the corner of a roof which is vulnerable...

Отзывы: