47
4b
Performing Power-On and Power-Off Commissioning
Power-on process
Power-off process
Onsite
environment
Onsite
environment
The hardware installation of the MicroDC3000H suite is
complete. For subsequent operations, see
Appendix
.
For details, see
Starting
and Stopping the UPS
in
Appendix B
.
P49
Loads refer to
power consuming
devices, such as
switches and
routers.
For details, see
Starting
and Stopping the UPS
in
Appendix B
.
P49