Installing Battery Packs
2c
33
Due to the limited length of cables, observe the following when installing battery packs:
Install battery packs in the following sequence: 7
–9 U, 4–6 U, and 1–3 U.
• If only one battery pack is required, place it in the position of battery pack 1.
• If two battery packs are required, place them in the positions of battery pack 1 and battery pack
1
Determine installation positions.
Use the floating nut installation bar to install the floating nuts on the tapped hole of the mounting bar
inside the cabinet.
The figure on the right shows the
positions of the floating nuts.
Installation method:
2
Install floating nuts.
Installation position of
battery packs