IDS2000 Dual-Row Aisle Containment
Installation Guide (Split-type Skylight, Old-Version
Sliding Door)
10 Cable Layout
Issue 02 (2015-06-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
214
Port
Connection Method
smoke sensor.
NO
Connects to the smoke sensor NO (blue).
MANUAL, REMOTE
Port REMOTE connects to the DO port on
the CCU or the ECC, and port MANUAL is
reserved.
SOUND (12 V+ G-)
The 12 V+ port and G- port respectively
connect to the positive and negative poles of
the audible and visual alarm.
1 (+ -) to 14 (+ -)
Ports + and - respectively connect to the
positive and negative poles of the skylight
magnetic lock.
POWER ALM
Connects to the DI port on the CCU or
ECC.
SMG ALM
Connects to the DI port on the CCU or
ECC.
LINK IN
Reserved port. It connects to no cable by
default. To connect multiple skylight
controllers to the fire extinguishing system
in cascading mode (tailored scenario),
connect the port to the LINK OUT port of
next skylight controller.
LINK OUT
Reserved port. It connects to no cable by
default. To connect multiple skylight
controllers to the fire extinguishing system
in cascading mode (tailored scenario),
connect the port to the LINK IN port of next
skylight controller.
----End
10.12.11 Connecting a Monitoring Cable to a Camera
Prerequisites
A network cable used for monitoring is prepared.
Procedure
Step 1
Connect the monitoring port on the camera to any network port on the switch by using the
network cable. The switch is powered by using the power over Ethernet (PoE) technology.