4.
Tighten the two captive screws a and b (shown in
mezzanine card.
Figure 5-10
Installing mezzanine cards
Step 8
Install the cover.
Step 9
Install the compute node.
.
Step 10
Power on the compute node.
Step 11
Configure the BIOS, OS, switch, and FC disk array for the mezzanine cards.
l
BIOS configuration
For details, see the
of the mezzanine card you use.
l
OS configuration
For details, see the
of the mezzanine card you use.
l
Switch configuration
For details, see the configuration guide of the switch you use.
l
FC configuration
For details, see the configuration guide of the FC disk array you use.
Step 12
Check whether the mezzanine firmware version is the latest.
l
If yes, no further action is required.
l
FusionServer Pro CH121 V5 Compute Node
User Guide
5 Optional Part Installation
Issue 06 (2019-08-10)
Copyright © Huawei Technologies Co., Ltd.
102