FusionModule5000 Smart Modular Data Center
Installation Guide (Single-Row Aisle Containment with
2000 mm High Cabinets, ECC800)
9 Installing Monitoring Devices
Issue 01 (2019-03-05)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
118
9.5 Installing an ECC800
Procedure
Step 1
Determine the mounting holes for an ECC800 based on the device layout of the network
cabinet, adjust the guide rails, and install floating nuts.
Step 2
Place the ECC800 in the network cabinet with caution, as shown by (1) in
Step 3
Secure the ECC800 in the network cabinet by tightening the M6 screws on the left and right
mounting ears clockwise, as shown by (2) in
Figure 9-10
Installing an ECC800
Step 4
(Optional) Remove the ECC800 main control module and install the SIM card in the correct
slot of the control module as required.
1.
Loosen the captive screws on both sides of the ECC800 main control module, pull the
handles on both sides of the control module, and take out the module, as shown in
Figure 9-11
Removing an ECC800 main control module
2.
Install the SIM card in the correct slot on the left side of the ECC800 main control
module, as shown in