
7
Check the AC power supply to the subrack.
b
Conducting a Power-On Check
b2. Subrack power-on check
Indicator
Description
Status
Status Description
STATUS
Status
indicator
Off
There is no power supply.
Steady green
The AC PEM is running properly.
Blinking green
• Blinking green at 0.5 Hz: hibernation voltage
• Blinking green at 4 Hz: power loading status of
the software
Steady red
• Input power overvoltage or undervoltage
• Output power overvoltage or undervoltage.
• Output power overcurrent or short circuit
• Over-temperature fault
• Fan fault
• Storage device fault
Table 2
Subrack AC PEM indicator description
b3. Subrack check after power-on
1. Check the MSX board operating status. If the HLY indicator is steady green, the boards are
running properly.
2. Check the operating status of service boards. If the HLY indicator is steady green, the boards
are running properly.
3. Observe the indicators DIP H to L on the MSX.