background image

4

Checking Hardware Installation

Check the power cable and PGND cable installation.

a

No.

Check List

1

–48 V power cables are blue, RTN power cables are black, and PGND cables are green and yellow. 
They can also be designed according to the customers' requirements.

2

The PGND cables and the power cables must be in good condition without any joints.

3

All power cables and PGND cables are properly connected.

4

The bare wires and OT terminals at the wiring terminals are tightly wrapped with PVC insulation tapes 
or heat shrink tubing.

5

Power cable engineering labels are attached at both ends of the power cables and PGND cables.

5

Check the signal cable installation.

b

No.

Check List

1

All the signal cables have passed the continuity check before they are routed.

2

The signal cables are connected correctly and the connectors are installed securely.

3

The cabling route complies with the engineering design. Signal cables are bound separately from power cables.

4

The signal cables are not placed on the heat dissipation section of the cabinet.

5

Sufficient slack is provided in cables for strain relief.

6

Cables should be straight and smooth. Cables in the cabinet are not crossed and cables outside the cabinet are 
bundled.

7

Surplus cables are reserved, and the tie wraps are tied properly and trimmed so that there are no sharp edges.

8

The signal cables are bound in proper positions and cable ties are bound with proper spacing.

9

Both ends of each cable are labeled clearly, and the labels and cable ties face the same direction. It is 
recommended that a label be affixed 20 mm away from the connector.

Check the connector and socket installation.

c

No.

Check List

1

Cable plug latches are locked firmly.

2

The pins of the network cable sockets and the HEADER sockets are complete and straight.

3

Spare connectors are covered with protective caps.

Conducting a Power-On Check

Check the DC power supply to the subrack.

a

a1. Subrack check before power-on

1. The subrack power cable is properly connected.

2. The PEM is not short-circuited.

3. The boards in the subrack are correctly installed.

4. The PEM circuit breaker of the subrack is 

switched off.

The blue DC power cable connects to the NEG(-) wiring 
terminal of the PDB and the NEG(-) wiring terminal of 
the PEM in the subrack. The black DC power cable 
connects to the RTN(+) wiring terminal of the PDB and 
the RTN(+) wiring terminal of the PEM in the subrack.

Note

Содержание eCNS280

Страница 1: ...along the guide rails and then tighten the screws on the panel Before the installation wear an ESD wrist strap or a pair of ESD gloves to prevent damage to the subrack by static electricity Install boards b 2 Slide the boards into the corresponding slots and then tighten the screws on the panel eCNS280 Quick Installation Guide V100R005C00 01 Note ...

Страница 2: ...he subrack provides two ground points on the left side on the rear panel If the subrack is used in North America connect both the ground points If the subrack is used in other regions connect one of the ground points 3 Connect the OT terminal of the blue DC power cable and the OT terminal of the black DC power cable to the wiring terminal marked NEG and the wiring terminal marked RTN on the PEM re...

Страница 3: ... cabinet 2 Open the power cable clip and slide it outwards 3 Insert the power cable into the clip 4 Slide the clip to the joint between the AC power cable and the connector 5 Close the clip to fasten the AC power cable 6 Secure other AC power cables in the same way Installing Optical Modules and Cables 1 Hold the optical module and insert it to position until it cannot move forward 2 Insert the op...

Страница 4: ...er and M6 screws Install the power module and fan module c Install the switch in the cabinet 1 Remove the filler panel 3 Install the fan module in the same way as installing the power module 4 Connect the power cable to the power module Installing the Ethernet Cable Connect one end of the Ethernet cable to the port for connecting another NE in the subrack and the other end to another NE as require...

Страница 5: ...ef 6 Cables should be straight and smooth Cables in the cabinet are not crossed and cables outside the cabinet are bundled 7 Surplus cables are reserved and the tie wraps are tied properly and trimmed so that there are no sharp edges 8 The signal cables are bound in proper positions and cable ties are bound with proper spacing 9 Both ends of each cable are labeled clearly and the labels and cable ...

Страница 6: ...eaker is abnormal Table 1 Subrack DC PEM indicator description a3 Subrack check after power on 1 Check the MSX board operating status If the HLY indicator is steady green the boards are running properly 2 Check the operating status of service boards If the HLY indicator is steady green the boards are running properly 3 Observe the indicators DIP H to L on the MSX Check the AC power supply to the s...

Страница 7: ...f the software Steady red Input power overvoltage or undervoltage Output power overvoltage or undervoltage Output power overcurrent or short circuit Over temperature fault Fan fault Storage device fault Table 2 Subrack AC PEM indicator description b3 Subrack check after power on 1 Check the MSX board operating status If the HLY indicator is steady green the boards are running properly 2 Check the ...

Отзывы: