eAN3810A
Hardware Installation Guide
1 eAN3810A Hardware Installation Guide
Issue 01 (2017-04-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
12
Figure 1-8
Requirements for the vertical deviation angle of a eAN3810A
(1) eAN3810A
(2) Installation support (pole or wall)
1.3 Unpacking the Equipment
This section describes how to unpack and check the delivered equipment to ensure that all the
materials are included and intact.
Context
When transporting, moving, or installing the equipment, components, or parts, you must:
Prevent them from colliding with doors, walls, shelves, or other objects.
Wear clean gloves, and avoid touching the equipment, components, or parts with bare hands,
sweat-soaked gloves, or dirty gloves.
Power on an eAN3810A within 24 hours after unpacking it. If you power off an eAN3810A
for maintenance, restore power to the eAN3810A within 24 hours.
Procedure
Step 1
Count the total number of the shipments.
If...
Then...
The total number of the components is consistent
with that recorded in the packing lists on all
packing boxes
Go to
Step 2
.