l
To perform the NQA test after a certain delay period, run the
start
delay
{
seconds
second
|
hh
:
mm
:
ss
} [
end
{
at
[
yyyy
/
mm
/
dd
]
hh
:
mm
:
ss
|
delay
{
seconds
second
|
hh
:
mm
:
ss
} |
lifetime
{
seconds
second
|
hh
:
mm
:
ss
} } ] command.
The test instance is started after a certain delay.
----End
6.5.3 Checking the Configuration
After configuring the FTP upload test, you can view the test result.
Prerequisites
The configurations of the FTP Upload Test function are complete.
Context
NOTE
NQA test results cannot be displayed automatically on a terminal. You must run the
display nqa results
command to view test results. By the default, the command output contains the records about only the last
five tests.
Procedure
Step 1
Run the
display nqa results
command to view the test results on the NQA client.
----End
Example
Run the
display nqa results
command. If the test is successful, the following is displayed.
l
CtrlConnTime
l
DataConnTime
l
SumTime
<Huawei>
display nqa results
NQA entry(admin, ftp) :testflag is inactive ,testtype is ftp
1 . Test 1 result The test is finished
SendProbe:1 ResponseProbe:1
Completion :success RTD OverThresholds number: 0
MessageBodyOctetsSum: 448 Stats errors number: 0
Operation timeout number: 0 System busy operation number:0
Drop operation number:0 Disconnect operation number: 0
CtrlConnTime Min/Max/Average: 438/438/438
DataConnTime Min/Max/Average: 218/218/218
SumTime Min/Max/Average: 656/656/656
Average RTT:380
Lost packet ratio: 0 %
6.6 Configuring the HTTP Test
This section describes how to configure a Hypertext Transfer Protocol (HTTP) test to check the
responding speed of the HTTP service in each phase.
Huawei AR150&200 Series Enterprise Routers
Configuration Guide - Network Management
6 NQA Configuration
Issue 02 (2012-03-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
154