Table 11 Cross-section area of the connecting conductor of the main 

circuit 

Rated current In  

(A) 

10  16 

20  32 

40 

50  63  75  100 

125 

150  175 

200 

225  250 

300 

350  400 

Cross-section area S 

of conductor  

(mm

2

1.5  2.5  6  10  16  25  35  50  70  95  120  185  240 

 

Rated current In  

(A) 

500 

630 

Copper 

conductor 

Pcs 

Cross-section 

area 

(mm

2

150 

185 

Copper 

busbar 

Pcs 

Cross-section 

area 

(mm

2

30×5 

40×5 

9.3  Various characteristics of the circuit breaker and its accessories are set by our 

company according to the order requirements, and cannot be adjusted freely 

during use. 

9.4  The handle of the circuit breaker can be in three positions: "Closed", "Open" and 

"Tripped". When the handle is in the trip position, it shall be pulled in the "Open" 

direction to make the circuit breaker trip again, and then the "Closing" operation 

can be carried out. 

9.5 

As  required  by  the  user,  the  rated  residual  operating  current  IΔn  and  earth 

leakage operating time shall be set (HUM8L non-delay earth leakage operating 

time is not adjustable, while HUM8LY earth leakage operation time is adjustable). 

9.6  According to Chapter 4 "Normal Working Conditions" of this instruction and the 

above articles of this chapter, the circuit breaker can be closed and put into 

operation after completing inspections. During the operation of the circuit breaker, 

the testing device shall be operated once a month according to Article 4.3 to 

confirm that the earth leakage protection function of the circuit breaker is normal. 

9.7  For installing the internal accessories, the circuit breaker must be tripped and 

interrupted before installation. 

Company Commitment 

On the premise that users abide by the use and storage conditions and that the 

product seals are intact, if the product is damaged or cannot be used normally due to 

manufacturing quality problems within 18 months from the production date of the 

product, our company will be responsible for the repairing or replacement free of 

charge. If the warranty period expires, users shall pay for the repair. However, if the 

damage is caused by the following circumstances, the fees for repair still shall be 

charged even within the warranty period: 

(1)  Misuse, self-modification, improper maintenance, etc. 

(2)  Use beyond the standard specification requirements. 

(3)  Falling, damage during transportation, etc. after purchase. 

(4)  Earthquake, fire, lightning strike, abnormal voltage, other natural disasters and 

secondary disasters, etc. 

Содержание HUM8L Series

Страница 1: ...oduct please read the instruction carefully and well keep it for future reference Product Certificate This product has passed the inspection and meets the requirements of GB T 14048 2 and therefore is...

Страница 2: ...her suddenly applied or slowly raised 3 Standards Followed The circuit breaker complies with the following standards IEC 60947 2 GB T 14048 2 Low voltage Switchgear and Controlgear Part 2 Circuit brea...

Страница 3: ...the non delay type Code Y for the delay type Code B for alarm without tripping Only earth leakage residual current protection function is available Design number Molded Case Circuit Breaker Enterpris...

Страница 4: ...ed current In A 10 16 20 25 32 40 50 63 80 100 125 100 125 150 160 175 200 225 250 250 300 350 400 400 500 630 Number of poles 3 4 3 4 3 3 4 3 4 3 3 4 3 3 3 4 3 3 Rated insulation voltage Ui V AC 800...

Страница 5: ...Rated values of auxiliary contacts and alarm contacts Conventional thermal current Ith 6 A Rated working current Ie 0 79 A 230 V AC Ie 0 47 A 400 V AC Ie 0 15 220 V DC 8 3 Shunt trip parameters Rated...

Страница 6: ...CS1 630 Electric operating mechanism MDX1 MDX2 MDX3 MDX4 Earth leakage alarm module LB 8 4 Parameters of the undervoltage release Rated voltage Ue AC 110 V 230 V 400 V DC 24 V 48 V 110 V The circuit...

Страница 7: ...kage alarm module 9 Use and Maintenance 9 1 Considerations before installation of the circuit breaker The appearance of the circuit breaker is in good condition and no load operation works normally Th...

Страница 8: ...ions of this instruction and the above articles of this chapter the circuit breaker can be closed and put into operation after completing inspections During the operation of the circuit breaker the te...

Страница 9: ...ebsite www huyu com cn In case of any questions please contact the dealer or our customer service department Dear customers To protect our environment please recycle the product or its components when...

Отзывы: