19
LP-83 Rev. 8.14.14
Figure 9
– Typical Installation with High Efficiency Boiler
NOTES:
1. Minimum pipe size should match connection size. Upsize pipe accordingly if greater flow is required.
2. A thermal expansion tank suitable for potable water must be sized and installed within this piping system between the backflow
preventer and the cold water inlet.
3. All circulators should have an integral flow check.
4. Drains and check valve between unit and storage tank will assist in purging air from system.
5. This drawing is meant to demonstrate system piping only. The installer is responsible for all equipment and detailing required by local
codes. In Massachusetts, you must install a vacuum relief valve per 248 CMR.
6. Mixing valve application is optional, but recommended to help prevent scalding. See Part 3, Section E for more information.
Содержание SuperStor Ultra
Страница 6: ...6 LP 83 Rev 8 14 14 Figure 1 Dimensions ...