H. SIDEWALL VENTING W/ TEE (INTAKE) AND COUPLING (EXHAUST)
NOTE:
Vent piping should be 12” over anticipated maximum snow level.
NOTE:
Drawing is meant to demonstrate system venting ONLY.
All vent pipes must be glued, properly supported, and the exhaust must be pitched a minimum of ¼” per foot back to the boiler to allow
drainage of condensate. When placing support brackets on vent piping, the first bracket must be within 1 foot of the boiler and the
balance at 4 foot intervals on the vent pipe. Boiler venting must be readily accessible for visual inspection for the first three feet from the
boiler.
Figure 14 – Sidewall Venting with Tee (Intake) and Coupling (Exhaust) – LP-293-E
Содержание ELP-110
Страница 48: ...48 LP 294 REV 9 2 14 Figure 27 Single or Cascade Master and Cascade Follower Controls ...
Страница 49: ...49 LP 294 REV 9 2 14 Figure 28 ...
Страница 76: ...76 LP 294 REV 9 2 14 Figure 32 ...
Страница 77: ...77 LP 294 REV 9 2 14 Figure 33 LP 294 B ...
Страница 80: ...80 LP 294 REV 9 2 14 ...
Страница 81: ...81 LP 294 REV 9 2 14 ...
Страница 82: ...82 LP 294 REV 9 2 14 MAINTENANCE NOTES ...