VEGA74
EN - 12
3. Move the left slide bar cursor in order to select the
aggregation time (see § 12.5) among the options:
2s,
5s, 10s, 30s, 1min, 2min, 5min, 10min, 15min, 30min
Move the central slide bar
cursor (“
GO
” symbol) to the
positions:
➢
→
Manual
start of recording by pressing the
GO/STOP
key (at the next minute after the pressure
of key)
➢
→
Automatic
start of recording at the date/time
set by the user (after a preliminary pressure of
GO/STOP
key in order to set the instrument in
stand-by mode).
Touch the corresponding field to
set the date/time
in the “MM:DD:YY HH:MM”
format and confirm
Move the right slide bar cursor (“
STOP
” symbol) in the
positions:
➢
→
Manual
stop of recording by pressing the
GO/STOP
key
➢
→
Automatic
stop of recording at the date/time
set by the user.
Touch the corresponding field to
set the date/time
in the “MM:DD:YY HH:MM”
format and confirm
4.
Insert the external clamp into instrument input
I1
5.
For indirect measurements of leakage current, connect the external clamp according to
Fig. 6. For direct measurements of leakage current, connect the clamp according to Fig.
7 and disconnect possible additional earth connections that could influence the test
results.
CAUTION
Possible additional earth connections could influence the measured value. In
case of real difficulty in removing them, we recommend performing the
measurement in an indirect way.
6. The real time value of the measured leakage current
(Irms) and it’s maximum value (Imax) appears on the
display as shown in the screen to the side.
Press the
SAVE
button or touch the
icon to save
the measurement (see § 7.1).