HT950N
EN - 8
5. OPERATIVE INSTRUCTIONS
5.1. INSTALLATION
For HT950N practice installation please consider the following specifications:
Installation
zone
must
to
be dust and corrosive gas free.
HT950N meter must to be installed:
Far from direct solar light and impact warm sources;
Far from MV devices (big meter counter, energy cables, SCR or TRIAC apparatus,
radiotransmitter).
You must prepare a square hole on 36.8 x 36.8 inch (height x width).
Insert HT950N and fix with standard screws and connectors.
5.2. ELECTRICAL
CONNECTIONS
Please see the following Fig. 3 to execute all electrical connections on HT950N meter.
Fig. 3: electrical connections on HT950N meter