background image

Split Unit Air

Conditioner

Hire Shops

A mobile unit for halls, large offices

and similarly sized areas.

Operating & Safety Guide 950

With the indoor unit switched OFF and isolated
from its power supply, make all the connections
from the umbilical assembly. 

All that remains is to plug the indoor unit into its
power supply and switch the supply ON.

Check that the amber power supply ON lamp is
illuminated, then press the red fan ON/OFF button
to start the indoor unit’s fan. 

The outdoor units’ fan

will start to operate ONLY when cooling is selected. 

Use

the fan speed control dial to select the indoor unit
fan speed.

If chilled air is required, press the green ‘cooling’
ON/OFF button and turn the thermostat control
clockwise to maximum. 

The unit is fitted with a time delay device that will
prevent the compressor from starting for
approximately 4 minutes

The unit will now be running, allow a minimum of
10 minutes for it to begin cooling.

Once the desired room temperature has been
reached, gradually turn the thermostat control
anti-clockwise 

until you hear a ‘click’. The unit will now

only emit chilled air when the room temperature rises.

Finally, adjust the outlet grill fins at the front of
the machine to direct the airflow as required.

If the red fault lamp illuminates, switch the unit
OFF and isolate it from its power supply

, then

contact your local HSS Hire Shop for advice.

Never use the Split Unit Air Conditioner except for
its intended purpose, 

If it will not do what you want,

assume you have the wrong equipment for the job.
Contact your local HSS Hire Shop for advice. 

Only use the Split Unit Air Conditioner for the
purpose it was designed for

. Improper use may cause

expensive damage and could be dangerous.

EQUIPMENT CARE

BASIC TECHNIQUES

Keep the equipment clean. 

You will find it less of a

chore if you clean it regularly, rather than wait until the
end of the hire period.

When not in use

, store the equipment somewhere

clean, dry and safe 

from thieves.

Switch the unit OFF and unplug from its power
supply, 

Remove all umbilical assembly connections from
both the indoor unit and the outdoor unit.

Finally, neatly coil the umbilical assembly and the
indoor unit’s power supply cable, ready for return

to your local HSS Hire Shop.

FINISHING OFF

Code 56754/56755

©HSS Hire Service Group Plc 2000 No. 950/01

Group Office: 25 Willow Lane, Mitcham, Surrey CR4 4TS

Web Site: http://www.hss.co.uk

Contact your local

0845 728 2828

…any comments?

If you have any suggestions to enable us to improve

the information within this guide please fax your

comments or write to the Product Manager at the

address below 

Fax: 020 8687 5001

950/01

Amber

Power ON

Lamp

Red Fault

Lamp

Red Fan

ON / OFF

Button

Green Cooling

ON / OFF

Button

Fan Speed

Control

Thermostat

Control

Control Panel

Отзывы: