Maintenance
30
2021-07-07
FM 240 MuW Beta Type S Rev.01
distributed by
Procedure
1.
Move the driver into the middle.
2.
Unfasten the stripper brushes (if fitted) from both front faces.
3.
Detach the clamp fittings from the ends of the cover band and pull
the cover band out of the driver.
4.
Pull the press rollers (a) on both front
faces of the driver out of the clamp (using
a hook).
5.
Check the band guide elements, such as
the press rollers (a), lifting rollers (b) and
locating pins, for wear.
−
If the cover band is worn, be sure also
to replace the band guide elements.
Worn guide elements will damage the
new cover band.
−
If the cover band is damaged, only
replace the band guide elements if
they are damaged.
Fit press rollers (a) with the larger
diameter on the outer.
6.
Push the new cover band with its broader side (with the chamfered
cutting edge) facing downwards through the driver and fix it at one
end by the clamp fitting.
7.
Carefully press the cover band into its guideway along its entire
length until it audibly snaps into place. It must not stick out at any
point, otherwise it will be damaged.
8.
Clamp the press rollers in place.
9.
Stretch the cover band and fix it by the clamp fitting at the other
end.
10.
Bolt on the stripper brushes (if fitted).
11.
To check that the carriage is correctly installed, run it slowly from
one end of the linear unit to the other, ensuring the cover band is
held all the time in its guideway.
Содержание Beta 40-SGS
Страница 2: ......