White wire to light
Blue wire to neutral
N
White wire to light
Green-yellow to light
Green-yellow to earth
Brown wire to switch
L
Setting the controls
With floodlight fully installed by electrician and
power on
1. Turn the LUX control knob to light ( ) position, turn the wall switch
on and wait 30 seconds for the control circuit to stabilise. Ensure the
TIME control knob is set at minimum (-).The lamp on the sensor light
will now switch on and will remain on for about 10sec.
2. Direct the sensor toward the desired scanning area by adjusting
the elbow joint and swivel joint on the sensor arm. Important:
loosen all lock nuts and screws on sensor arm and wall mount
bracket before making any adjustments.
3. Have someone move across the centre of the area to be scanned and
slowly adjust the angle of the sensor arm until the unit senses the
moving person, causing the lamp to switch on. (Refer Fig.1 B)
4. Adjust time control to required setting.
5. To set the light level at which the lamp will automatically switch
“On”, turn the LUX control knob from daylight to night. If the lamp
is required to switch on earlier, e.g. dusk, wait for the desired light
level, then slowly turn the LUX control knob towards daylight while
someone walks across the centre of the area to be detected. When
the lamp switches on, release the LUX knob. You may need to
make further adjustments to achieve your ideal light level setting.
Important: To avoid dust build-up and ensure proper functioning
of the sensor light, wipe the sensor lens lightly with a damp
cloth every 3 months. Never modify the unit, there are no user
serviceable parts inside.
Dial settings show
TEST MODE
Fig. 5
Fig. 4
Fig. 1B
Highest Sensitivity
Fig. 1A
Lowest Sensitivity
>
2m
4M
8M
approx.180˚
12M
Installation
Installing a wall switch adjacent to the power source is recommended.
1. Remove mounting bracket from the fitting and use to mark position
on the wall/ceiling.
2. Mount the bracket on the wall/ceiling. Ensure the method of fixing
can support up to a 10kg weight.
3. Reattach fitting to the bracket.* Do not tighten bolts completely to
allow for mains wiring termination.
*Ensure that cord gland faces downwards in the final mounting
position as shown in Fig.2
4. Choose rubber-sheathed 3-core circular cord, H05RN-F 3G 1mm
2
(not supplied) for the mains wiring.
5. Remove junction box cover, strip insulation from cord and insert in to
cord gland. Wire up as shown in Fig 4.
6. Replace junction box cover and tighten screws to ensure a
weatherproof seal. Tighten gland.
7. Orient fitting to desired position and tighten bolts completely.
8. DO NOT MEGGER TEST
Fig. 3 Detection Area