Installation
39
User Manual
Figure 37: Sliding the Frame Sliders into the Rails
Step 6.
Place the frame in the cabinet, and install ten cage nuts in the desired 1U slots of the rack:
three cage nuts in the front part of each cabinet post, and two cage nuts in the rear part of
each cabinet post.
Figure 38: Installing the Cage Nuts
Step 7.
Attach the frame to the rack by using ten spacer cage nut to adapt the square openings in the
vertical support, and screwing ten M6 pan head screws - four in the front part of the rack,
and 6 in its rear part. The recommended torque is 6.55-7.35 Nm. See
R
F
Содержание SN2100M
Страница 42: ...42 User Manual Figure 42 SN2010 SFP Cable Orientation Figure 43 SN2410M SN2410bM Cable Orientation ...
Страница 70: ...70 User Manual Figure 76 SN2010M Pull out Tab ...
Страница 98: ...98 User Manual 24 China CCC Warning Statement 25 Taiwan BSMI Class A Statement Warning to the User ...