Procedure
1.
Back up all server data.
2.
3.
Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4.
Disconnect all peripheral cables from the server.
5.
Do one of the following:
• Server in rack mode:
Remove the server from the rack.
Position the tower server for hardware configuration.
6.
7.
8.
9.
Remove the energy pack holder slot covers.
10. Install the energy pack holder.
Hardware options installation
79