
IMPORTANT: The 2U server blades must be installed in bay 1 and bay 5.
Prerequisites
Before performing this procedure, make sure that you have the T-15 Torx key available.
Procedure
1. Align the blade and install it in the chassis:
a. Insert the blade in the chassis.
b. Close the latch on the server blade and secure it.
2. Optional: Lock the server blade.
Associated hardware procedures
23
Содержание Edgeline EL8000
Страница 20: ...20 Rack mount option...