Prepare for installation
1.
Unpack and check included parts:
•
Switch
•
Console cable
•
Accessory kit (installation hardware)
•
Power cord
•
Documentation kit
2.
Prepare for installation.
CAUTION:
To avoid personal injury or product damage, review the
“Installation precautions”
(page 3)
before beginning the installation.
3.
Power on and verify that self-test completes normally. An Aruba 2930F 24G or 48G switch
does not contain a power on/off switch. It is turned on by connecting the AC power cord to
the switch and to an AC power source.
1
2
3
4
5
6
Port LEDs: Off after self-test unless a network cable is connected and
the port is receiving link beat.
1
Global Status LED: Green after self-test in default configuration.
2
Locator/Unit-Identification LED: Off after self-test.
3
Speed Mode Selected LED: Off after self-test in default configuration.
4
4
Aruba 2930F 24G/48G Switch Quick Setup Guide and Safety/Regulatory Information