10.
Install the riser cage.
11.
Connect the controller cables.
12.
Install the system board module.
13.
Connect all peripheral cables to the server.
14.
Power up the server (
on page 20).
Installing a full-length PCIe GPU
Prerequisites
Before installing this option, be sure that you have the following:
The components included with the hardware option kit
Procedure
1.
Observe the following alerts:
WARNING:
To reduce the risk of personal injury from hot surfaces, allow the drives and the internal
system components to cool before touching them.
CAUTION:
To prevent damage to electrical components, properly ground the server before
beginning any installation procedure. Improper grounding can cause electrostatic discharge.
2.
on page 20).
3.
Disconnect all peripheral cables from the server.
4.
Remove the GPU module from the chassis (
Removing the GPU module from the chassis
21).
5.
Place the module on a flat, level work surface.
Installing a full-length PCIe GPU
53
Содержание Apollo 6500 Gen10
Страница 25: ...To replace the component reverse the removal procedure Operations 25...
Страница 71: ...Cabling 71...