1-26
Installing the Tape Library
Step 6: Connect Library to Host
5. Gently pull the SCSI and power cables back toward the rear of the rack. Use a
cable tie to secure them to the rail at the back of the rack. The cable tie should be
at about the same height as the top of the library.
6. Carefully route the cables down along the back rail. Use a cable tie to secure
them to the rail just above the slide mounting bracket. Clip off the ends of all
four cable ties.
Figure 1-18
Secured SCSI and Power Cables
7. Close the back door on the rack.
8. Push the library back into the rack.
9. Open the front access door. Replace the two screws that secure the library to the
rack, then re-lock the door.
Содержание Surestore 15 Slot with DLT7000
Страница 10: ...x Contents ...
Страница 14: ...xiv Tables ...
Страница 15: ...1 1 Installation 1 Installing the Tape Library ...
Страница 44: ...1 30 Installing the Tape Library Moving or Shipping the Library ...
Страница 45: ...2 1 Using Tapes 2 Using Tape Cartridges ...
Страница 54: ...2 10 Using Tape Cartridges Maintaining Tape Cartridges ...
Страница 55: ...3 1 Library Operation 3 Operating the Library ...
Страница 96: ...3 42 Operating the Library Troubleshooting ...
Страница 97: ...A 1 Supplies Support A Supplies and Customer Support ...
Страница 109: ...B 1 Safety and Regulatory B Safety and Regulatory Information ...
Страница 112: ...B 4 Safety and Regulatory Information Regulatory Information Regulatory Information ...
Страница 113: ...B 5 Safety and Regulatory Information Regulatory Information Safety and Regulatory Declaration of Conformity ...
Страница 118: ...B 10 Safety and Regulatory Information Regulatory Information ...
Страница 119: ...C 1 TapeAlert Messages C TapeAlert Messages ...
Страница 130: ...C 12 TapeAlert Messages TapeAlert Messages and Descriptions ...
Страница 134: ...Glossary 4 Glossary ...