
Standard Operation Procedure
Tabulator
:
Issue Department
:
Xin-Xin Chen
NPSU-PPE
Auditor
:
Ethan Lai
Steps
:
Document No.
: Pegasus600
DISASS’Y SOP
Station :
Operation Name : Ver. :
Date
:
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification)
Qty.
Fixture list (Specification)
Qty.
Tear off gaskets for LG & AUO Panel
27(2/2)
2017/5/23
1.00
Glove Requirements: Half-finger gloves
1. Tear off the gaskets at the front of the
connector of Panel (Fig. 1).
Exclude BOE, this step is done only for
Panel produced by LG and AUO (Fig. 2).
Fig. 1
Fig. 2
Gasket for
LG Panel
LG Panel
AUO Panel
No gap shown in
this area, need
to tear off the
gasket
BOE Panel has
gap in this area,
so no gasket is
plated