
Standard Operation Procedure
Tabulator
:
Issue Department
:
Xin-Xin Chen
NPSU-PPE
Auditor
:
Ethan Lai
Steps
:
Document No.
: Pegasus600
DISASS’Y SOP
Station :
Operation Name : Ver. :
Date
:
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification)
Qty.
Fixture list (Specification)
Qty.
Unscrew ODD SATA CNTR
14(1/1)
2017/5/23
1.00
1. Unscrew (Torx Pin-Head
×
2) all joints of
ODD SATA CNTR, then take out ODD cable
(Fig. 1, 2).
Don't pull the cable using force.
Torsion: 4.0
±
0.5 kgf.cm
Take the screwdriver vertically to the screw
holes.
Glove Requirements: Half-finger gloves
Fig. 2
Electric Screwdriver (S-4000MS)
Fig. 1
1
2
ODD cable