1
2
2
Replacing the communication board
Procedure
1. Prepare the server for hardware replacement
.
3. Remove the communication board
4. Install the new communication board
.
5. Prepare the server for operation
.
Replacing a server drive
Procedure
1. Prepare the server for hardware replacement
.
3.
If installed,
remove the communication board
4.
Perform the step applicable to your situation:
• If you are replacing the server drive 1 or are replacing both server drives,
.
• If you are only replacing the server drive 2,
remove only the drive 2 assembly
.
5. Remove the drive from the cage
6. Install the new drive in the cage
7. Install the server drive assembly
8. Prepare the server for operation
.
Remove a server drive from the cage
Prerequisites
Before you perform this procedure, make sure that you have a T-10 screwdriver available.
Procedure
1.
Remove the drive screws.
2.
Remove the drive from the cage.
Replacing the communication board
47
Содержание ProLiant TM200
Страница 12: ...12 Customer self repair ...
Страница 13: ...Customer self repair 13 ...
Страница 14: ...14 Customer self repair ...
Страница 18: ...18 Illustrated parts catalog ...
Страница 57: ...1 2 2 Secure the screw on the fin base end of the heatsink Removal and replacement procedures 57 ...
Страница 70: ...Fan locations Fan location in the server Fan location in the storage expansion unit 70 Fan locations ...
Страница 72: ...Server fan cabling Ambient temperature sensor cabling 72 Server fan cabling ...