
Hardware Options Installation
49
9. Connect the heatsink connector to the connector on the system board.
Item Description
1
Processor 1 heatsink connector
2
Processor 2 heatsink connector
10. Open the latches on the corresponding PPM slot.
11. Install the PPM for processor 2 (if installing a second processor).
NOTE: PPM 1 is embedded onto the system board.
Содержание ProLiant ML350 Generation 4p
Страница 1: ...HP ProLiant ML350 Generation 4p Server User Guide March 2005 First Edition Part Number 382582 001 ...
Страница 7: ...Contents 7 Acronyms and Abbreviations 149 Index 153 ...
Страница 8: ......
Страница 116: ...116 HP ProLiant ML350 Generation 4p Server User Guide ...
Страница 118: ...118 HP ProLiant ML350 Generation 4p Server User Guide ...
Страница 121: ...Troubleshooting 121 ...
Страница 124: ...124 HP ProLiant ML350 Generation 4p Server User Guide ...
Страница 127: ...Troubleshooting 127 ...
Страница 130: ...130 HP ProLiant ML350 Generation 4p Server User Guide ...
Страница 142: ......