
Operations 16
CAUTION:
For proper cooling, do not operate the server without the access panel, baffles,
expansion slot covers, or blanks installed. If the server supports hot-plug components, minimize
the amount of time the access panel is open.
1.
Power down the server (on page
13
).
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Unlock the tower bezel (on page
14
).
4.
Place the server on its side.
5.
Remove the access panel:
a.
Loosen the access panel thumbscrew.
b.
Slide the access panel back.
c.
Lift the access panel away from the chassis.
Install the air baffle
1.
Insert the tabs on the baffle into the slots on the rear chassis.
Содержание ProLiant ML10 v2
Страница 12: ...Component identification 12 Drive numbering ...
Страница 18: ...Operations 18 5 Remove the air baffle ...
Страница 63: ...Support and other resources 63 ...
Страница 64: ...Support and other resources 64 ...
Страница 68: ...Acronyms and abbreviations 68 xHCI Extensible Host Controller Interface ...