
Hardware options installation 53
2.
Slide the power supply into the power supply bay until the device locks into place.
3.
Connect the power cord to the power supply.
4.
Connect the power cord to the power source.
5.
Be sure that the power supply LED is green ("
Power supply LED
" on page
12
).
6.
Be sure that the front panel external health LED is green.
Internal solid state drive expansion bay option
1.
Power down the server (on page
25
).
2.
Extend the server from the rack (on page
25
).
3.
Remove the access panel (on page
26
).
4.
Remove the SPI board (on page
28
).
5.
Install the solid state drive.
6.
Connect the cable.
Содержание ProLiant DL585 G7
Страница 18: ...Component identification 18 Secondary processor memory board Device numbers ...
Страница 23: ...Component identification 23 Fan locations Power supply backplane components ...
Страница 48: ...Hardware options installation 48 4 Remove the tray 5 Remove the DIMM baffle 6 Install the DIMMs ...
Страница 71: ...Cabling 71 Cabling DVD ROM drive cabling ...
Страница 92: ...Troubleshooting 92 ...
Страница 108: ...Regulatory compliance notices 108 Taiwan notices ...
Страница 117: ...Support and other resources 117 ...
Страница 118: ...Support and other resources 118 ...