Hardware options installation 81
4.
Install the redundant power supply into the bay until it clicks.
5.
Connect the power cord to the power supply.
6.
Use the strain relief clip from the server hardware kit to secure the power cord.
7.
Route the power cord through the cable management solution.
8.
Connect the power cord to the power source.
Be sure that the power supply LED is green.
Содержание ProLiant DL388e
Страница 82: ...Cabling 82 Cabling Storage cabling 4 drive LFF SATA cabling Mini SAS cable Power cable ...
Страница 83: ...Cabling 83 4 drive SFF SATA cabling Mini SAS cable Power cable ...
Страница 84: ...Cabling 84 6 drive LFF SATA cabling Mini SAS cable 1 and two port SATA cable 2 Power cable ...
Страница 86: ...Cabling 86 o Mini SAS cables connected to a riser board with SAS support o Smart Array cables Power cable ...
Страница 93: ...Cabling 93 Sideband signal 1 and SATA 2 cables connected to the expander backplane Power cables ...
Страница 97: ...Cabling 97 o Secondary GPU power cabling ...
Страница 131: ...Support and other resources 131 ...
Страница 132: ...Support and other resources 132 ...