Removal and replacement procedures 44
SFF hard drive cage
To remove the component:
1.
Power down the server (on page
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Extend ("
Extend the server from the rack
Remove the server from the rack
on page
) the server from the rack.
4.
Remove the access panel ("
5.
Remove all hot-plug hard drives ("
6.
Remove the air baffle (on page
7.
Remove the fan cage ("
8.
Disconnect all cables from the hard drive backplane.
9.
Remove the hard drive cage.
To replace the component, reverse the removal procedure.
Systems Insight Display
To remove the component:
1.
Power down the server (on page
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Extend ("
Extend the server from the rack
Remove the server from the rack
on page
) the server from the rack.
4.
Remove the access panel ("
5.
Remove the air baffle (on page
6.
Remove the fan cage ("
Содержание ProLiant DL385p
Страница 12: ...Customer self repair 12 ...
Страница 13: ...Customer self repair 13 ...
Страница 14: ...Customer self repair 14 ...
Страница 50: ...Removal and replacement procedures 50 o 8 or 16 SFF configuration o 8 LFF configuration ...
Страница 90: ...Cabling 90 Cabling SAS hard drive cabling SFF hard drive cabling SFF cabling with optional drive cage ...
Страница 91: ...Cabling 91 LFF hard drive cabling Optical drive cabling ...
Страница 92: ...Cabling 92 FBWC cabling 8 or 16 drive SFF 8 drive LFF ...
Страница 99: ...Acronyms and abbreviations 99 UID unit identification USB universal serial bus ...