Removal and replacement procedures 41
IMPORTANT:
An immediate shutdown is a hardware-controlled function and it overrides any
firmware or software actions.
•
In the operating system:
o
The Health Driver performs an orderly shutdown if it detects a cautionary temperature level. If the
server detects a critical temperature level before the orderly shutdown occurs, the server
performs an immediate shutdown. Additionally, the Health Driver performs an orderly shutdown if
more than one fan is failed or removed.
o
When Thermal Shutdown is disabled in RBSU, the server performs an immediate shutdown if it
detects a critical temperature level.
IMPORTANT:
An immediate shutdown is a hardware-controlled function and it overrides any
firmware or software actions.
To remove the component:
1.
Extend ("
Extend the server from the rack
Remove the server from the rack
on page
) the server from the rack.
2.
Remove the access panel ("
3.
Remove the fan.
CAUTION:
Do not operate the server for long periods with the access panel open or
removed. Operating the server in this manner results in improper airflow and improper cooling
that can lead to thermal damage.
To replace the component, reverse the removal procedure.
Fan cage
To remove the component:
1.
Power down the server (on page
2.
Remove all power:
Содержание ProLiant DL385p
Страница 12: ...Customer self repair 12 ...
Страница 13: ...Customer self repair 13 ...
Страница 14: ...Customer self repair 14 ...
Страница 50: ...Removal and replacement procedures 50 o 8 or 16 SFF configuration o 8 LFF configuration ...
Страница 90: ...Cabling 90 Cabling SAS hard drive cabling SFF hard drive cabling SFF cabling with optional drive cage ...
Страница 91: ...Cabling 91 LFF hard drive cabling Optical drive cabling ...
Страница 92: ...Cabling 92 FBWC cabling 8 or 16 drive SFF 8 drive LFF ...
Страница 99: ...Acronyms and abbreviations 99 UID unit identification USB universal serial bus ...