A-4
Planning Considerations
Specific Considerations for the 3500yl-PWR Switches
P
lan
ni
ng
C
ons
id
era
ti
o
ns
Specific Considerations for the 3500yl-
PWR Switches
The following is an example list of considerations during the planning phase
specific to the 3500yl Switches:
■
What if power is lost to the switch?
•
Power for the switch to operate (system power)
•
Power for PoE devices
■
Which devices to plug into which ports and with what priorities?
•
Port prioritization
•
Port priority class
•
Reserve watts
•
Total watts available (398)
■
Which bank of 24 ports will be used?
■
Will load balancing be used?
■
Will any mini-GBICs be used and in what ports?
■
Should the 620 RPS/EPS be plugged into a different power source than
the switch it is going to back up.
Содержание ProCurve 600
Страница 1: ...Power over Ethernet HP ProCurve Power over Ethernet PoE PoE Planning and Implementation Guide ...
Страница 2: ......
Страница 3: ...Power over Ethernet PoE PoE Planning and Implementation Guide ...
Страница 42: ......
Страница 66: ......
Страница 70: ......
Страница 80: ......
Страница 90: ......
Страница 102: ......
Страница 120: ......
Страница 152: ......
Страница 156: ......
Страница 165: ...Index 3 Index system power 5412zl 8212zl 10 5 10 6 T threshold configuing global 2 6 configuring per slot 2 6 ...
Страница 166: ......
Страница 167: ......