Index – 2
physical specifications, switch
port LEDs
FDx
Link/Act
ports
10/100Base-TX, location on
switch
network connections
Power LED
behavior during self test
power source
precautions
mounting the switch
power requirements
R
rack
mounting precautions
regulatory statements
resetting the switch
troubleshooting procedure
S
safety specifications
self test
LED behavior during
specifications
connectors
electrical
environmental
physical
summary of switch installation
switch
connecting to a power
source
electrical specifications
environmental
specifications
included parts
mounting on horizontal
surface
physical specifications
switch operation
verifying after installation
T
testing
diagnostic tests
switch operation
tips for troubleshooting
troubleshooting
basic tips
common network problems
diagnostic tests
testing the switch
Содержание ProCurve 1700-8
Страница 1: ...Installation and Getting Started Guide www procurve com ProCurve Switch 1700 8 ...
Страница 2: ......
Страница 3: ...ProCurve Switch 1700 8 Installation and Getting Started Guide ...
Страница 20: ......
Страница 24: ......
Страница 30: ......
Страница 43: ...B 11 Safety and EMC Regulatory Statements Safety Information Safety Information Japan ...
Страница 44: ...B 12 Safety and EMC Regulatory Statements Safety Information Safety Information China ...
Страница 46: ...B 14 Safety and EMC Regulatory Statements EMC Regulatory Statements Japan VCCI Class A Korea Taiwan ...
Страница 61: ......