2-3
Installing the Switch
Installation Procedures
Installation Procedures
Summary
Follow these easy steps to install your switch. The rest of this chapter
provides details on these steps.
1.
Prepare the installation site.
Make sure of the following:
•
the network cabling is the correct type and length.
2-5.
See page 2-4 for installation precautions.
2.
Verify the switch passes self test.
This is a simple process of
plugging the switch into a power source and observing that the
LEDs on the switch’s front panel show correct operation.
See
3.
Mount the switch.
The switch can be mounted on any horizontal
surface.
4.
Connect power to the switch.
Once the switch is mounted, plug
in the AC power adapter.
5.
Connect the network devices.
Using the appropriate network
cables, connect computers, servers, printers and other periph-
erals, and other network devices including other switches, hubs,
or routers to the switch ports.
At this point, the switch is fully installed and your network should be
up and running. See the rest of this chapter if you need more detailed
information on any of these installation steps.
Содержание ProCurve 1700-8
Страница 1: ...Installation and Getting Started Guide www procurve com ProCurve Switch 1700 8 ...
Страница 2: ......
Страница 3: ...ProCurve Switch 1700 8 Installation and Getting Started Guide ...
Страница 20: ......
Страница 24: ......
Страница 30: ......
Страница 43: ...B 11 Safety and EMC Regulatory Statements Safety Information Safety Information Japan ...
Страница 44: ...B 12 Safety and EMC Regulatory Statements Safety Information Safety Information China ...
Страница 46: ...B 14 Safety and EMC Regulatory Statements EMC Regulatory Statements Japan VCCI Class A Korea Taiwan ...
Страница 61: ......