2-5
Installing the Hub
Installation Summary
Installing the
Hu
b
2. Verify the Hub Operates Correctly
Before mounting the hub in its network location, you should first verify that
it is working properly by plugging it into a power source and verifying that it
passes its self test.
1.
Connect the power cord supplied with the hub to the power connector on
the back of the hub, and then into a properly grounded electrical outlet.
N o t e
2.
Check the LEDs on the hub.
When the hub is powered on, it performs its diagnostic self test. The self
test occurs by all port LEDs illuminating and going off. The self-test takes
approximately three seconds to complete.
LED Behavior:
During the self test:
•
Initially, all the hub and port LEDs are on.
•
After three seconds, the port LEDs go off.
When the self test completes successfully:
•
The large Power LED stays on.
•
The large Fault LED goes off.
•
The port LEDs go into their normal operational mode.
Connect power cord
to power connector
Power and Fault LEDs
Hub Port LEDs
Roadhw0.bk : ROADHW2.FM Page 5 Thursday, May 28, 1998 5:40 PM