![HP Neoview Messages Скачать руководство пользователя страница 300](http://html.mh-extra.com/html/hp/neoview-messages/neoview-messages_manual_165138300.webp)
Effect
The operation fails.
Recovery
Try to REFRESH with the CANCEL option to release the DDL lock, and resubmit
the original REFRESH statement. If the error persists, contact your HP service provider.
SQL 20525
20525 Task task-name cannot be executed remotely.
task-name
is the name of a refresh task.
Cause
The refresh operation cannot be executed remotely because the buffer is full.
Effect
The operation fails.
Recovery
Do not attempt recovery. HP support will perform recovery operations in response
to an automatically generated dial-out message about this condition.
SQL 20526
20526 Refresh completed with errors. See log-file for description.
log-file
is the EMS collector.
Cause
See
log-file
for descriptions of the errors.
Effect
The operation fails.
Recovery
Resolve errors described in
log-file
or the file specified by the OUTFILE option
in the REFRESH statement, and resubmit the command. If this problem persists, contact your
HP service provider.
SQL 20527
20527 Failed to complete the task task-name correctly.
task-name
is the name of a refresh task.
Cause
The refresh operation cannot complete due to a task failure.
Effect
The operation fails.
Recovery
REFRESH the materialized view again: first use the CANCEL option to clean up,
and then retry the REFRESH command. If this problem persists, contact your HP service
provider.
SQL 20528
20528 Failed to increment the current epoch of table table-name.
table-name
is the name of a table used by the materialized view.
Cause
The refresh operation cannot complete because a failure occurred on a required
internal task.
Effect
The operation fails.
Recovery
REFRESH the materialized view again: first use the CANCEL option to clean up,
and then retry the REFRESH command. If this problem persists, contact your HP service
provider.
SQL 20529
20529 Failed to execute the command name.
name
is the command that was executed.
Cause
The refresh operation cannot complete because a failure occurred on a required
internal task.
Effect
The operation fails.
300
Utility Messages (20000 Through 23099)
Содержание Neoview Messages
Страница 12: ...12 ...
Страница 66: ...66 ...
Страница 129: ...Recovery Supply the input values for the IDENTITY column 129 ...
Страница 130: ...130 ...
Страница 172: ...172 ...
Страница 178: ...178 ...
Страница 184: ...184 ...
Страница 238: ...238 ...
Страница 266: ...266 ...
Страница 268: ...268 ...
Страница 350: ...350 ...
Страница 378: ...378 ...
Страница 384: ...384 ...
Страница 400: ......