2-10
Installing the Switch
Installation Procedures
In
sta
llin
g
th
e
Sw
itc
h
2.
Check the LEDs on the switch as described below.
When the switch is powered on, it performs its diagnostic self test. Self test
takes approximately 50 seconds to complete.
LED Behavior
During the self test:
•
Initially, all the switch and port LEDs are on. Most of the LEDs go off
and then may come on again during phases of the self test.
•
For the duration of the self test, the Self Test LED stays on.
Self Test LED
Switch port LEDs
Power and
Fault LEDs
Switch 2650
Switch 2650-PWR
LED
Mode
Clear
Reset
Spd mode: off = 10 Mbps,
flash = 100 Mbps, on = 1000 Mbps
PoE-Ready 10/100Base-TX Ports (1 - 48)
1
11
23
12
24
Power
Fault
hp
procurve
switch
2650-PWR
J8165A
PoE
Act
FDx
Link|M
Test
RPS
EPS
Fan
Status
Spd
2
2
4
6
8
10
12
14
16
18
20
22
24
1
3
5
7
9
11
13
15
17
19
21
23
13
14
PoE
Test LED
Содержание J4899B
Страница 2: ......
Страница 3: ...ProCurve Series 2600 Switches Installation and Getting Started Guide ...
Страница 60: ... This page is intentionally unused ...
Страница 82: ... This page is intentionally unused ...
Страница 92: ... This page is intentionally unused ...
Страница 101: ...C 9 Safety and EMC Regulatory Statements EMC Regulatory Statements Safety and EMC Regulatory Statements Korea Taiwan ...
Страница 108: ... This page is intentionally unused ...
Страница 115: ......