
Specification
Value
Rated input power (W)
874 W at -40 VDC input
865 W at -48 VDC input, nominal input
854 W at -72 VDC input
Rated input power (BTUs per hour)
2983 at -40 VDC input
2951 at -48 VDC input, nominal input
2912 at -72 VDC input
Power supply output
—
Rated steady-state power (W)
800 W at -40 VDC to -72 VDC
Maximum peak power (W)
800 W at -40 VDC to -72 VDC
Maximum peak power
800 W at -40 VDC to -72 VDC input
WARNING: To reduce the risk of electric shock or energy hazards:
• This equipment must be installed by trained service personnel.
• Connect the equipment to a reliably grounded secondary circuit source. A secondary circuit has no direct
connection to a primary circuit and derives its power from a transformer, converter, or equivalent isolation
device.
• The branch circuit overcurrent protection must be rated 27 A.
CAUTION: This equipment is designed to permit the connection of the earthed conductor of the DC supply circuit
to the earthing conductor at the equipment.
If this connection is made, all of the following must be met:
• This equipment must be connected directly to the DC supply system earthing electrode conductor or to a
bonding jumper from an earthing terminal bar or bus to which the DC supply system earthing electrode
conductor is connected.
• This equipment must be located in the same immediate area (such as adjacent cabinets) as any other
equipment that has a connection between the earthed conductor of the same DC supply circuit and the earthing
conductor, and also the point of earthing of the DC system. The DC system must be earthed elsewhere.
• The DC supply source is to be located within the same premises as the equipment.
• Switching or disconnecting devices must not be in the earthed circuit conductor between the DC source and the
point of connection of the earthing electrode conductor.
Specifications
160
Содержание HPE ProLiant DL325
Страница 24: ...Customer self repair 24 ...
Страница 25: ...Customer self repair 25 ...
Страница 26: ...Customer self repair 26 ...
Страница 61: ... SFF a Remove the optical drive cage b Remove the blank Removal and replacement procedures 61 ...
Страница 63: ... SFF a Remove the optical drive cage b Remove the optical drive Removal and replacement procedures 63 ...
Страница 68: ...10 Remove the iLO service port assembly 11 Remove the front I O module Removal and replacement procedures 68 ...
Страница 135: ... 4LFF drive connected to type a controller 4LFF drive connected to type p controller Slot 1 Cabling 135 ...
Страница 136: ... Slot 2 Slot 3 Cabling 136 ...
Страница 139: ... Slot 2 Slot 3 Cabling 139 ...
Страница 145: ... SFF Cable routing Power supply Non hot plug power supply Cabling 145 ...
Страница 148: ...Item Description Orange Front I O cable Blue Ambient temperature sensor cable Cable routing USB 3 0 LFF SFF Cabling 148 ...
Страница 149: ...Cable routing Serial port Cabling 149 ...
Страница 150: ...Cable routing Chassis Intrusion Detection switch Cable routing M 2 SSD Slot 1 Slot 2 Cabling 150 ...
Страница 152: ... Slot 2 Slot 3 Cabling 152 ...
Страница 153: ...Cable routing Energy pack Cabling 153 ...