![HP HPE ProLiant DL180 Gen10 Скачать руководство пользователя страница 90](http://html.mh-extra.com/html/hp/hpe-proliant-dl180-gen10/hpe-proliant-dl180-gen10_maintenance-and-service-manual_164421090.webp)
• Do not disassemble, crush, puncture, short external contacts, or dispose the battery in fire or water.
• If the server no longer automatically displays the correct date and time, then replace the battery that
provides power to the real-time clock. Under normal use, battery life is 5 to 10 years.
Removing and replacing the system battery
Procedure
1.
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Disconnect all peripheral cables from the server.
4.
Do one of the following:
•
Extend the server from the rack
•
Remove the server from the rack
.
5.
.
6.
remove the secondary riser cage
7.
Locate the system battery on the system board
.
8.
Remove the system battery.
9.
To replace the component, reverse the removal procedure.
10.
Properly dispose of the old battery. For more information about battery replacement or proper
disposal, contact an authorized reseller or an authorized service provider.
90
Removal and replacement procedures
Содержание HPE ProLiant DL180 Gen10
Страница 14: ...14 Customer self repair ...
Страница 15: ...Customer self repair 15 ...
Страница 16: ...16 Customer self repair ...
Страница 17: ...Customer self repair 17 ...
Страница 56: ... Secondary riser cage Slot 4 Slot 5 or 6 56 Removal and replacement procedures ...
Страница 63: ... Secondary riser cage Slot 4 Slot 5 or 6 Removal and replacement procedures 63 ...
Страница 124: ... 24 bay SFF hot plug drive model Fan bay numbering 124 Component identification ...
Страница 129: ...Cable routing SFF drive model Box 1 to type a controller Box 1 to type p controller Cabling 129 ...
Страница 130: ...Box 2 to type a controller Box 2 to type p controller 130 Cabling ...
Страница 131: ...Box 3 to system board Box 3 to type a controller Cabling 131 ...
Страница 132: ...Box 3 to type p controller 8 bay SFF power cable default 132 Cabling ...
Страница 137: ...Mini SAS cable to SAS expander Cabling 137 ...
Страница 139: ... M 2 SSD enablement board installed in secondary riser Cabling 139 ...
Страница 143: ...Cable routing USB 3 0 Cable routing Power supply HPE 500W power supply cabling non hot plug Cabling 143 ...
Страница 144: ...Cable routing Serial port Cable routing iLO Service Port SFF LFF 144 Cabling ...
Страница 146: ... Secondary riser cage Slot 4 Slot 5 or 6 146 Cabling ...
Страница 147: ...Cable routing GPU Color Description Orange GPU power cable Blue Rear 2 bay SFF power cable Cabling 147 ...