To power down the server, use one of the following methods:
• Press and release the Power On/Standby button.
This method initiates a controlled shutdown of applications and the OS before the server enters
standby mode.
• Press and hold the Power On/Standby button for more than 4 seconds to force the server to enter
standby mode.
This method forces the server to enter standby mode without properly exiting applications and the OS.
If an application stops responding, you can use this method to force a shutdown.
• Use a virtual power button selection through iLO.
This method initiates a controlled remote shutdown of applications and the OS before the server
enters standby mode.
Before proceeding, verify that the server is in standby mode by observing that the system power LED is
amber.
Extending the server from the rack
WARNING:
To reduce the risk of personal injury or equipment damage, be sure that the rack is
adequately stabilized before extending a component from the rack.
Prerequisites
T-25 Torx screwdriver
Procedure
1.
If the rear panel cables are not secured with a cable management arm, do the following:
.
b.
Disconnect all peripheral cables from the server.
c.
Disconnect each power cord from the server.
2.
Disengage the server from the rack:
a.
Pull down the quick release levers on each side of the server.
b.
If necessary, use a T-25 Torx screwdriver to loosen the shipping screws.
c.
Slide the server out of the rack.
30
Removal and replacement procedures
Содержание HPE ProLiant DL180 Gen10
Страница 14: ...14 Customer self repair ...
Страница 15: ...Customer self repair 15 ...
Страница 16: ...16 Customer self repair ...
Страница 17: ...Customer self repair 17 ...
Страница 56: ... Secondary riser cage Slot 4 Slot 5 or 6 56 Removal and replacement procedures ...
Страница 63: ... Secondary riser cage Slot 4 Slot 5 or 6 Removal and replacement procedures 63 ...
Страница 124: ... 24 bay SFF hot plug drive model Fan bay numbering 124 Component identification ...
Страница 129: ...Cable routing SFF drive model Box 1 to type a controller Box 1 to type p controller Cabling 129 ...
Страница 130: ...Box 2 to type a controller Box 2 to type p controller 130 Cabling ...
Страница 131: ...Box 3 to system board Box 3 to type a controller Cabling 131 ...
Страница 132: ...Box 3 to type p controller 8 bay SFF power cable default 132 Cabling ...
Страница 137: ...Mini SAS cable to SAS expander Cabling 137 ...
Страница 139: ... M 2 SSD enablement board installed in secondary riser Cabling 139 ...
Страница 143: ...Cable routing USB 3 0 Cable routing Power supply HPE 500W power supply cabling non hot plug Cabling 143 ...
Страница 144: ...Cable routing Serial port Cable routing iLO Service Port SFF LFF 144 Cabling ...
Страница 146: ... Secondary riser cage Slot 4 Slot 5 or 6 146 Cabling ...
Страница 147: ...Cable routing GPU Color Description Orange GPU power cable Blue Rear 2 bay SFF power cable Cabling 147 ...